失眠网,内容丰富有趣,生活中的好帮手!
失眠网 > 取水工程 water intake project英语短句 例句大全

取水工程 water intake project英语短句 例句大全

时间:2018-07-31 13:20:42

相关推荐

取水工程 water intake project英语短句 例句大全

取水工程,water intake project

1)water intake project取水工程

1.Numerical simulation forwater intake project of Huaneng Yingkou Power Plant;华能营口电厂取水工程的流场数值模拟

2.In somewater intake projects, silt deposit has become the most troublesome problem, which adversely affect the water quality and treatment cost.在某些取水工程中,泥砂淤积往往是困扰取水质量和处理成本的老大难问题。

3.Thewater intake project of a power plant is a long-distance and low-pressure water supply project.某电厂取水工程为长距离低压供水系统,为减少管道投资,除管线中间一段低凹高压管段采用钢管外,大部分管线采用低压的玻璃钢夹砂钢管。

英文短句/例句

1.Study on Test of Settling Basin for Oncomelania Snail and Drawing Water in Middle-level Project;沉螺池和中层取水工程措施试验研究

2.Elementary Discussion on Research of Groundwater Works Construction Market Admittance Management;浅谈地下水取水工程建设市场准入管理研究

3.On the Common Faults of Water Pump Station从阳朔取水工程改造谈桂北小水厂泵房通病

4.Effect of bank filtration on the removal of contaminant from Yellow River傍河取水工程对黄河水中污染物去除效果评价

5.The Evaluation of the Capacity of Flood Control of Water Intake Engineering and Flood Discharge of Watercourse of Ningxia Zhongning Electric Power Plant;宁夏中宁电厂取水工程防洪及河道行洪评价

6.This system had been applied to strobe engineering of tongjiyan and run well.该系统已经在通济堰渠首取水工程闸门工程中投入使用,取得了良好的运行效果。

7.Research on Engineering Suitability of Percolating Water Abstraction from Beneath Riverbed in Baishi Reservoir of Liaoning Province;辽宁省北票市白石水库渗滤取水工程适宜性研究

8.Water Pressure Test of Take-in and Drainage Project of Circulation Water for the Project of Yantai烟台某工程循环水取、排水工程压水试验

9.On influential analysis of production water intake of industrial projects on situation of regional water sources工业工程生产取水对区域水资源状况影响分析

10.The Design of Intake of Piloting Irrigated Area Engineering of Letan Reservoir in Guangxi广西乐滩水库引水灌区工程取水口设计

11.Tropism of Financing Channels on PFI Construction of Water Supplying Works in China;中国供水工程建设PFI融资取向的选择

12.Experimental study on scouring and silting for water intake and drainage project of Sanmen Nuclear Power Plant三门核电厂取排水工程冲淤试验研究

13.Research and Comparison on the Positions of Water Intakes of the Water Transfer Project from Yangtze River to Hanjiang River for the Middle Route of South-to-North Water Transfer Project南水北调引江济汉工程取水口位置比选研究

14.Application of Simple Deep Well Point Dewatering in Construction of Feiya Water Intake Project简易深井井点降水在飞亚取水口工程中的应用

15.The Sediment Analysis of the Intakes of Longmenqu Water Supply Engineering in Jiaocheng County交城县龙门渠供水工程取水口泥沙分析

16.Preliminary Study on the Influence of Water Taking in Xinjiang Controlled Hydro-junction Project新疆控制性水利枢纽工程的取水影响初探

17.Optimal Design and Construction of Intake Works Expansion Project in Mountainous River山区河流取水扩建工程的优化设计及施工

18.Craftwork for Installation of 3000t coffer of intake water of Xiamen gas-fired power plant厦门燃气电厂取水口工程3000T沉箱安装工艺

相关短句/例句

intake works取水工程

1.The process flow,design parameters and characteristics ofintake works of water-source heat pump for air-conditioning system in Wenchang Mansion in Liuzhou City were introduced.介绍了柳州市文昌综合楼空调系统水源热泵取水工程的工艺流程、设计参数及特点。

3)intake engineering取水口工程

1.A key problem of maintaining regural operation of the power plant is to make the cycle cooling water flow without a hitch through the waterintake engineering in the sea ice covered waters.为准确详细地分析取水口工程构筑物与海冰的相互作用,流冰在取水前池的生成、发展分布及运动等,特别是重冰年对取水的影响。

4)water intake and drainage project取排水工程

1.Experimental study on scouring and silting forwater intake and drainage project of Sanmen Nuclear Power Plant三门核电厂取排水工程冲淤试验研究

5)water intake and delivery project取水输水工程

6)filter project渗滤取水工程

延伸阅读

加利福尼亚州调水工程加利福尼亚州(简称加州)位于美国西南部,是美国人口最多的一个州。1980年人口约2200万,其中大部分集中在气候温暖的中部和南部沿海地区。加州的中央河谷四周环山,中部一片肥沃的冲积平原是美国的重要农业区。加州西南沿海地带工业发达,人口密集,盛产亚热带水果蔬菜,有洛杉矶、圣迭戈等重要城市。由于州内降水量的地区分布极不均匀,北部地区年降水量超过2500mm,南部沙漠地带年降水量小于50mm,造成全州的河川径流量有70%产生于州首府萨克拉门托市以北,而其以南的中部、南部地区水源奇缺,远远不能满足工农业与城市发展对水量的需求(约占全州需水量的80%)。为此,半个多世纪以来,加州境内曾先后建设了四项调水工程,使中部、南部的严重干旱缺水问题得以较好解决(见图)。工程概况 洛杉矶输水道工程 属洛杉矶市水源工程。19首先建成第一输水道,从内华达山脉东侧的内陆河欧文斯河调水入洛杉矶市。30年代又将线路向上游延伸到莫诺湖。1970年建成第二输水道。两条输水道基本上都是管道,总长824km,输水能力22~24m3/s,年调水量约5.8亿m3。科罗拉多河输水道工程 由南加州都市水管区建设,于1940年建成。这项调水工程从科罗拉多河的帕克坝上引水,通过隧洞穿越分水岭到洛杉矶地区,主干线长389km,输水道上设 4座水泵站,总扬程550m,年调水能力15亿m3。科罗拉多河上有胡佛坝等多年调节水库,调水水源可靠,过去一直是加州南部的主要供水水源。随着科罗拉多河下游其他水利工程的建设,可分配给科罗拉多河的水量将减少到仅限该州拥有水权的6.8亿m3。中央河谷工程 由美国联邦政府投资兴建。1937年开工,1951年主要输水工程通水。截至1982年共建成水库19座,总库容154亿m3;输水引水渠 8条,总长986km,总引水能力636m3/s;水电站11座,总装机容量163万kW。每年可供水134亿m3,除满足原有水权用户要求外,增加兴利水量89亿m3。完成已批准的其余工程后,供水量还可再增加7亿m3。主体工程包括:①在河谷北部萨克拉门托河上建沙斯塔水库,在萨克拉门托-圣华金三角洲的南部建特雷西抽水站向圣华金河下游调水;②在圣华金河上建弗里恩特坝,开发利用本地水资源,并向南部更缺水的图莱里湖内陆河流域调水;③为增加北部的可调水量,在加州北部单独入海的特里尼蒂河上建水库,凿隧洞调水入萨克拉门托河。此外,在各支流上也建了水库,在输水道上还建了旁引水库。这项工程主要目的是发展农业灌溉(1982年实灌约110万公顷),同时还有水电、城市供水、防洪和改善环境等效益。加州引水工程 由加州政府投资建设,其部分工程与中央河谷工程相结合。1959年开工,1972年主要输水工程通水。主体工程是在萨克拉门托河支流费瑟河上建奥罗维尔水库,在三角洲南部建水泵站,抽水入715km长的加利福尼亚输水道,经 6级抽水翻越分水岭到加州南部洛杉矶地区,其中最大的水泵站埃德蒙斯顿站扬程为587m。输水道输水能力125m3/s,设计年供水能力52亿m3。到1973年已完成水库21座,总库容71亿m3,输水干支渠5条,总长1028km,水泵站15座。已成工程年供水能力平均28亿m3,丰水年37亿m3。工程主要效益是保证城市工业用水,调入南加州的水量占全工程供水量的59%。此外,还有防洪、灌溉、水电及旅游等综合效益。工程规划特点 ①通过多种途径解决一个地区的干旱缺水问题;②注意在增加可利用水量的基础上调水,不损害原有用水户利益;③注意使供水工程与水力发电、防洪、改善环境等要求相结合。总的说来,这项工程是促进地区经济繁荣的成功建设范例。

如果觉得《取水工程 water intake project英语短句 例句大全》对你有帮助,请点赞、收藏,并留下你的观点哦!

本内容不代表本网观点和政治立场,如有侵犯你的权益请联系我们处理。
网友评论
网友评论仅供其表达个人看法,并不表明网站立场。